Launching of Badulla Bridge

Launching of 50.4mtr prefabricated bridge at Badulla, River opposite Badulla Railway Station.This was a very hard job done by WSR CONSTRUCTION. For this launching we used 80 ton, 50 ton crawler cranes and 25 ton rough terrain crane.

During the working period the power supply of High Voltage was disconnected from 8.00am to 6.00pm & had to work with having wires around the cranes. The road way completely closed down and we had to work on the above specified time.

The job was completed within six days to the utmost satisfaction to the RDA and connected authorities.