Transporting units inside Upper Kotmale Tunnel

Transporting 03 nos of voltage testing units in to the upper Kothmale Hydro Power by lowbed Trailers. The length of the Tunnel was 80 meters and there was only 04 inches gap between the tunnel wall and the Prime Movers for the first 20 meters.